Iran Drills 11 Offshore Wells in 2016

Siamak Afshari, director of NIDC’s offshore drilling operations, said the wells required 6,240 meters of drilling of which 2,512 meters of development wells and 3,727 meters of workover wells. 

NIDC owns three offshore drilling rigs which are currently operating at their designated sites.