Gas Pressure Station Launched in Khonj

The facility can add pressure to 110 million cubic meters of gas on a daily basis and injects gas to the 8th Iran gas trunkline (IGAT-8).

The facility was constructed with IRR601b (nearly $18m) and €42.8m of investment.

The project’s construction began in 2014 under an EPC contact.

Build in  9 hectares of land, the facility is equipped with turbo-compressors, scrubbers, gas generators, air compressors and air coolers.